README.md 4.2 KB

Q1-19 OKR Archive

Table of contents

Quarterly OKRs

Objective: Expand the Jsgenesis team

  • KR Measurement Deadline: End of Q1
  • Tracked: Weekly
  • Tracking Manager: Martin
  • Key Results: Martin and Bedeho equally
    1. Add 3 full time blockchain developers
    2. Add 1 full time UI/UX designer/team
    3. Add 1 full time, full stack developer
    4. Source 25 candidates outside of angel/jsg/dribble/hh
    5. Interview at least 25 candidates once, and 15 candidates twice

  • Final Score
Date KR #1 KR #2 KR #3 KR #4 KR #5 Total
05.04.19 0.33 1 1 0.36 0.39 0.616
  • Notes:
    • This was only tracked through updating a spreadsheet.
    • In order for the OKR system to have value, we need to grade them at regular and schedule intervals, and keep the results public for accountability.
  • Tracking
Date KR #1 KR #2 KR #3 KR #4 KR #5
26.03.19 0.33 1 1 0.36 0.3
05.04.19 0.33 1 1 0.36 0.39


Objective: Launch and grow Staked podcast

  • KR Measurement Deadline: End of Q1
  • Tracked: Every 2 weeks
  • Tracking Manager: Martin
  • Key Results: Martin and Bedeho equally
    1. Launch a new branded podcast available in all major podcast channels
    2. Record and publish 5 first episodes
    3. Get 100 subscribers
    4. Get 500 listens
  • Final Score
Date KR #1 KR #2 KR #3 KR #4 Total
05.04.19 1 0.4 0.24 0.37 0.55
  • Notes:
    • Subscribers are assumed to be equal to unique downloads of newest EP.
    • Listener count are *unique* downloads
  • Tracking
Date KR #1 KR #2 KR #3 KR #4
18.03.19 1 0.4 x x
05.04.19 1 0.4 0.24 0.37

Personal OKRs

Bedeho (@bedeho)

Objective: Make Joystream easier to understand for prospective community members and Jsgenesis hires

  • KR Measurement Deadline: End of Q1 (see notes)
  • Tracked: Weekly
  • Key Results:
    1. Publish first whitepaper draft
    2. Add role list to joystream.org
  • Final Score
Date KR #1 KR #2 Total
05.04.19 1.0 0.7 0.85
  • Notes:
    • This OKR was only live for ~3 weeks, and was only made for internal "testing"


  • Tracking:
Date KR #1 KR #2
18.03.19 0.98 0.7
05.04.19 1.0 0.7

Objective: Establish critical routines for future productivity

  • KR Measurement Deadline: End of Q1 (see notes)
  • Tracked: Weekly
  • Key Results:
    1. Draft planning framework for releases, quarters and longer term
    2. Come up with specification framework
    3. Learn Rust and Substrate
    4. Draft framework for how to plan on Github
  • Final Score
Date KR #1 KR #2 KR #3 KR #4 Total
05.04.19 xxx xxx xxx x 0
  • Notes:
    • This OKR was only live for ~3 weeks, and was only made for internal "testing"

  • Tracking:
Date KR #1 KR #2 KR #3 KR #4
18.03.19 0.6 0.1 0.1 0
05.04.19 xxx xxx xxx x