Sumer - Council Election Round #11 - Performance Review and Minutes
1 - Basic Information
1.1 - Introduction
The council is expected to produce reports during each round and provide feedback in the form of workflow, challenges, thinking and performance as well as minutes covering important events during the council session.
Usernames referenced are Joystream usernames.
All times are calculated based on 6 second blocktimes and not actual blocktimes.
The Council Round number is taken from the chain, the KPI rounds have an offset number.
This report was compiled by @maxlevush with assistance from @freakstatic and @tomato
1.2 - Council Round Overview
- Council Election Round: #13
- Council Term: 11
- Start Block: #1184400
- End Block: #1285200
- Forum thread for round feedback: N/A
1.3 - Council members & vote participation
- All usernames are listed in the order given by
activeCouncil
from chain state.
- Votes cast includes all types of vote (Approve, Reject, Abstain & Slash)
- In the event a proposal is not finalized within the current council, it will be indicated and current council votes will not be recorded due to system limitations
1.4 - Council Roles
- Council Secretary
- Deputy Council Secretary
1.5 - Council Mint & Budget Status
(Note: The council budget is now based on the rewards for roles, council payments and validator payments. Jsgenesis decides how much to set the mint to.)
2 - Minutes
2.1 - Proposal Overview
Proposal Types
- 25 Proposals Created
- 17 Text Proposals
- 2 Spending Proposals
- 1 SetWorkingGroupLeaderReward Proposals
- 5 SetWorkingGroupMintCapacity Proposals
- 0 BeginReviewWorkingGroupLeaderApplication Proposals
- 0 TerminateWorkingGroupLeaderRole
- 0 FillWorkingGroupLeaderOpening
- 0 SetValidatorCount
- 0 AddWorkingGroupLeaderOpening
- 0 SetElectionParameters
- 0 RuntimeUpgrade
Proposal States
- 23 Approved & executed proposals
- 0 Canceled proposals
- 0 Rejected proposals
- 0 Slashed proposals
- 0 Expired proposals
- 2 proposals passed to next council
- These proposals didn't gather enough quorum in the current council term, so the votes are reset and passed to the next council.
Failed Proposals
All proposals was approved
Total time for proposals to finalize: 246.79 hours
Average time for proposals to finalize: 12.98 hours
- This average is calculated from all proposals, including expired proposals but excluding canceled proposals.
2.2 - Proposal Breakdown
Proposal 204 - WG Lead Term Limits
- Proposal Link: https://testnet.joystream.org/#/proposals/204
- Proposal Type: Text
- Status: Passed to next council
- Time to finalize: 9570 blocks (15,95h)
- Created by: @maxlevush
- Participants: @tomato, @nexusfallout, @fierydev, @l1dev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 205 - Storage Lead - Tasks + Reporting
- Proposal Link: https://testnet.joystream.org/#/proposals/205
- Proposal Type: Text
- Status: Passed to next council
- Time to finalize: 8728 blocks (14,55h)
- Created by: @maxlevush
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 206 - Replenish my "give account"
- Proposal Link: https://testnet.joystream.org/#/proposals/206
- Proposal Type: Spending
- Status: Approved & Executed
- Time to finalize: 2005 blocks (3,34h)
- Created by: @tomato
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @l1dev, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 207 - KPI 11.3 - Deputy Council Secretary
- Proposal Link: https://testnet.joystream.org/#/proposals/207
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 2449 blocks (4,08h)
- Created by: @maxlevush
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 208 - Sumer - KPI 11.2 - Council Secretary
- Proposal Link: https://testnet.joystream.org/#/proposals/208
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 2685 blocks (4,48h)
- Created by: @tomato
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @l1dev, @oiclid, @xfactorus, @xandrell, @andybut, @maxlevush
Proposal 209 - Refill operations mint
- Proposal Link: https://testnet.joystream.org/#/proposals/209
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 1645 blocks (2,74h)
- Created by: @l1dev
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 210 - Content Curator Lead Report (Statistics)
- Proposal Link: https://testnet.joystream.org/#/proposals/210
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 7044 blocks (11,74h)
- Created by: @igrex
- Participants: @tomato, @nexusfallout, @freakstatic_council, @blackmass, @xandrell, @leet_joy, @igrex, @andybut, @nkhlghbl, @maxlevush
Proposal 211 - Antioch KPI 10.4 - Tokenomics Repo
- Proposal Link: https://testnet.joystream.org/#/proposals/211
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 7235 blocks (12,06h)
- Created by: @freakstatic_council
- Participants: @tomato, @nexusfallout, @freakstatic_council, @blackmass, @xfactorus, @xandrell, @leet_joy, @igrex, @andybut, @maxlevush
Proposal 212 - Fill Working Group Mint Capacity
- Proposal Link: https://testnet.joystream.org/#/proposals/212
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 4045 blocks (6,74h)
- Created by: @igrex
- Participants: @tomato, @nexusfallout, @freakstatic_council, @oiclid, @xfactorus, @xandrell, @leet_joy, @igrex, @andybut, @maxlevush
Proposal 213 - Show what you are paid for
- Proposal Link: https://testnet.joystream.org/#/proposals/213
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 3623 blocks (6,04h)
- Created by: @oiclid
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @oiclid, @xfactorus, @leet_joy, @igrex, @doppelganger23, @maxlevush
Proposal 214 - Fill Storage WG Mint
- Proposal Link: https://testnet.joystream.org/#/proposals/214
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 4464 blocks (7,44h)
- Created by: @nexusfallout
- Participants: @tomato, @nexusfallout, @freakstatic_council, @blackmass, @xfactorus, @leet_joy, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 215 - Joining polkadot.subscan.io
- Proposal Link: https://testnet.joystream.org/#/proposals/215
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 3237 blocks (5,40h)
- Created by: @andybut
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @xfactorus, @xandrell, @leet_joy, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 216 - KPI 10.4 - Council Minutes
- Proposal Link: https://testnet.joystream.org/#/proposals/216
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 4951 blocks (8,25h)
- Created by: @tomato
- Participants: @tomato, @nexusfallout, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 217 - Change Curator Lead rewards
- Proposal Link: https://testnet.joystream.org/#/proposals/217
- Proposal Type: SetWorkingGroupLeaderReward
- Amount: From 63700 to 58530
- Status: Approved & Executed
- Time to finalize: 7858 blocks (13,10h)
- Created by: @maxlevush
- Participants: @tomato, @freakstatic_council, @oiclid, @xfactorus, @xandrell, @leet_joy, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 218 - Reward for Bounty #10
- Proposal Link: https://testnet.joystream.org/#/proposals/218
- Proposal Type: Spending
- Status: Approved & Executed
- Time to finalize: 5556 blocks (9,26h)
- Created by: @igrex
- Participants: @tomato, @nexusfallout, @freakstatic_council, @oiclid, @xandrell, @leet_joy, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 219 - Merge access to be granted to WG Leads
- Proposal Link: https://testnet.joystream.org/#/proposals/219
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9247 blocks (15,41h)
- Created by: @isonar
- Participants: @tomato, @nexusfallout, @freakstatic_council, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 220 - Merge Discord Video Bot PR
- Proposal Link: https://testnet.joystream.org/#/proposals/220
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 26076 blocks (43,46h)
- Created by: @isonar
- Participants: @tomato, @nexusfallout, @freakstatic_council, @blackmass, @fierydev, @xfactorus, @xandrell, @igrex, @andybut, @maxlevush
Proposal 221 - Content Curator Lead Report (Statistics)
- Proposal Link: https://testnet.joystream.org/#/proposals/221
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 12623 blocks (21,04h)
- Created by: @igrex
- Participants: @tomato, @nexusfallout, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 222 - Refill Storage Mint
- Proposal Link: https://testnet.joystream.org/#/proposals/222
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 10408 blocks (17,35h)
- Created by: @nexusfallout
- Participants: @tomato, @nexusfallout, @blackmass, @fierydev, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 223 - Curator Lead - Tasks + Reporting Require
- Proposal Link: https://testnet.joystream.org/#/proposals/223
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9862 blocks (16,44h)
- Created by: @maxlevush
- Participants: @tomato, @nexusfallout, @freakstatic_council, @fierydev, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 224 - Fill Working Group Mint Capacity
- Proposal Link: https://testnet.joystream.org/#/proposals/224
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 8870 blocks (14,78h)
- Created by: @igrex
- Participants: @tomato, @freakstatic_council, @fierydev, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 225 - Weekly Curator Working Group Report
- Proposal Link: https://testnet.joystream.org/#/proposals/225
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 8993 blocks (14,99h)
- Created by: @igrex
- Participants: @tomato, @freakstatic_council, @blackmass, @fierydev, @xfactorus, @xandrell, @igrex, @andybut, @doppelganger23, @maxlevush
Proposal 226 - Reduce reward Kryptos (Bounty 10)
- Proposal Link: https://testnet.joystream.org/#/proposals/226
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 5188 blocks (8,65h)
- Created by: @igrex
- Participants: @tomato, @supunssw, @freakstatic_council, @oiclid, @xfactorus, @xandrell, @igrex, @andybut, @nkhlghbl, @maxlevush
Proposal 227 - DRAFT Content Curator WG OKRs
Proposal 228 - Content Curator WG OKRs (SP10)
2.4 - Select threads & events
N/A
2.5 - Working Group Spotchecks
3 - Review
3.1 - Workflow, Performance, Challenged & Thinking
4 - Obligations
Council obligations are payments or items that carry through council sessions. These are noted so that future councils can easily see what items they should be aware of. Items can be removed from here once they have been resolved or become outdated.
4.1 Current Documents / Processes
- Council Report
- Each council should produce a report which highlights important events, council participation, mint spending and other important facts surrounding the council term
- Council Budget
- This is a proposal which tries to guide how many tokens the current council may have available to it during a term. This is a non binding proposal, so is mainly used as a guide for now.
4.2 Regular Payments / Proposals
- Council Mint
- The council mint needs to be checked on a regular basis and in the event it is near depletion, a council member should notify a member of Jsgenesis in order for it to be refilled.
- The council mint is set at a value decided by Jsgenesis.
- Council Roles
- Council Secretary
- This role was introduced in Council Round #18 and the payments are now managed by KPI rewards.
- Content Curator Mint
- The Content Curator Mint currently has a maximum value of 5 million tokens.
- The Content Curator Mint has to be filled periodically and the agreed amount was discussed earlier. The amount may change in the future, but the rewards for this role are dependent on the council passing these proposals in a timely fashion.
- The Content Curator Lead role is expected to keep track of their mint level and any member of the Joystream platform can create a proposal to refill this mint.
- Storage Mint
- The Storage Mint currently has a maximum value of 5 million tokens.
- This mint has be refilled periodically
- The Storage Lead role is expected to keep track of their mint level and any member of the Joystream platform can create a proposal to refill this mint.
4.2 Bounties
5 - Report changelog
04.11.2020
- added working group review section
22.10.2020
- updated budget section to reflect nature of new budget system
- updated events to be threads & events
14.09.2020
- removed member addresses and replaced with member IDs since they take less space
- added realized and unrealized spending\