Sumer - Council Election Round #36 - Performance Review and Minutes
1 - Basic Information
1.1 - Introduction
The council is expected to produce reports during each round and provide feedback in the form of workflow, challenges, thinking and performance as well as minutes covering important events during the council session.
Usernames referenced are Joystream usernames.
All times are calculated based on 6.10 second blocktimes and not actual blocktimes.
The Council Round number is taken from the chain, the KPI rounds have an offset number.
1.2 - Council Round Overview
1.3 - Council members & vote participation
- All usernames are listed in the order given by
activeCouncil
from chain state.
- Votes cast includes all types of vote (Approve, Reject, Abstain & Slash)
- In the event a proposal is not finalized within the current council, it will be indicated and current council votes will not be recorded due to system limitations
1.4 - Council Roles
- Council Secretary
- Council Deputy Secretary
1.5 - Council Mint & Budget Status
(Note: The council budget is now based on the rewards for roles, council payments and validator payments. Jsgenesis decides how much to set the mint to.)
2 - Minutes
2.1 - Proposal Overview
Proposal Types
- 27 Proposals Created
- 14 Text Proposals
- 6 Spending Proposals
- 0 SetWorkingGroupLeaderReward Proposals
- 7 SetWorkingGroupMintCapacity Proposals
- 0 BeginReviewWorkingGroupLeaderApplication Proposals
- 0 TerminateWorkingGroupLeaderRole
- 0 FillWorkingGroupLeaderOpening
- 0 SetValidatorCount
- 0 AddWorkingGroupLeaderOpening
- 0 SetElectionParameters
- 0 RuntimeUpgrade
Proposal States
- 21 Approved & executed proposals
- 1 Canceled proposals
- 0 Rejected proposals
- 0 Slashed proposals
- 0 Expired proposals
- 5 proposals passed to next council
- These proposals didn't gather enough quorum in the current council term, so the votes are reset and passed to the next council.
Failed Proposals
2.2 - Proposal Breakdown
Proposal 895 - Mint Content Working Group
- Proposal Link: https://testnet.joystream.org/#/proposals/895
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 12587 blocks (21.32h)
- Created by: @laura
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @ururu, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council
Proposal 896 - OKR Reward for Content Curator
- Proposal Link: https://testnet.joystream.org/#/proposals/896
- Proposal Type: Spending
- Status: Approved & Executed
- Time to finalize: 12520 blocks (21.21h)
- Created by: @laura
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @ururu, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council
Proposal 897 - 34.I-3 - Deputy Council Secretary
- Proposal Link: https://testnet.joystream.org/#/proposals/897
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 18317 blocks (31.03h)
- Created by: @svasilenko
- Participants: @marinag_mary, @svasilenko, @marat_mu, @okayko, @lkskrn, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @laura, @freakstatic_council
Proposal 898 - KPI 34.I-2 - Council Secretary
- Proposal Link: https://testnet.joystream.org/#/proposals/898
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 10816 blocks (18.32h)
- Created by: @tomato
- Participants: @kadyrovs, @svasilenko, @marat_mu, @ururu, @nanapa6otaet, @zazik, @xfactorus, @ilich, @laura, @freakstatic_council, @art_khabibullin, @tomato
Proposal 899 - 34.I-3 - Deputy Council Secretary
- Proposal Link: https://testnet.joystream.org/#/proposals/899
- Proposal Type: Text
- Status: Canceled
- Created by: @zazik
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @okayko, @lkskrn, @blackmass, @zazik, @laura, @freakstatic_council, @art_khabibullin, @tomato
Proposal 900 - Rewards for completed work
- Proposal Link: https://testnet.joystream.org/#/proposals/900
- Proposal Type: Spending
- Amount: 3606202
- Destination member: isonar
- Status: Approved & Executed
- Time to finalize: 3168 blocks (5.37h)
- Created by: @isonar
- Participants: @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @tomato
Proposal 901 - 33.I-4 - Council Minutes
- Proposal Link: https://testnet.joystream.org/#/proposals/901
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9603 blocks (16.27h)
- Created by: @ilich
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @marat_mu, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @art_khabibullin
Proposal 902 - Weekly Storage WG Report 26
- Proposal Link: https://testnet.joystream.org/#/proposals/902
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 11626 blocks (19.70h)
- Created by: @0x2bc
- Participants: @kadyrovs, @svasilenko, @kalpakci, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @art_khabibullin
Proposal 903 - Refill Storage WG mint
- Proposal Link: https://testnet.joystream.org/#/proposals/903
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 10408 blocks (17.63h)
- Created by: @0x2bc
- Participants: @kadyrovs, @svasilenko, @kalpakci, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @art_khabibullin
Proposal 904 - OWG Report 33
- Proposal Link: https://testnet.joystream.org/#/proposals/904
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 4892 blocks (8.29h)
- Created by: @l1dev
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @kalpakci, @lkskrn, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @art_khabibullin
Proposal 905 - Curator Lead OKR rewards
- Proposal Link: https://testnet.joystream.org/#/proposals/905
- Proposal Type: Spending
- Amount: 2185792
- Destination member: laura
- Status: Approved & Executed
- Time to finalize: 7818 blocks (13.24h)
- Created by: @svasilenko
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @lkskrn, @ururu, @blackmass, @nanapa6otaet, @zazik, @ilich, @controlla, @laura, @art_khabibullin
Proposal 906 - Refill OWG mint
- Proposal Link: https://testnet.joystream.org/#/proposals/906
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 6079 blocks (10.30h)
- Created by: @l1dev
- Participants: @marinag_mary, @svasilenko, @marat_mu, @lkskrn, @ururu, @nanapa6otaet, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council
Proposal 907 - Merge list of PRs
- Proposal Link: https://testnet.joystream.org/#/proposals/907
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 25067 blocks (42.47h)
- Created by: @svasilenko
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @kalpakci, @marat_mu, @blackmass, @zazik, @xfactorus, @ilich, @controlla, @laura, @art_khabibullin
Proposal 908 - KPI 33.II-4 - Reports
- Proposal Link: https://testnet.joystream.org/#/proposals/908
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 10579 blocks (17.92h)
- Created by: @svasilenko
- Participants: @kadyrovs, @svasilenko, @kalpakci, @marat_mu, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council, @art_khabibullin, @tomato
Proposal 909 - Refill OWG mint
- Proposal Link: https://testnet.joystream.org/#/proposals/909
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 5097 blocks (8.63h)
- Created by: @l1dev
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @lkskrn, @ururu, @nanapa6otaet, @zazik, @xfactorus, @ilich, @laura, @freakstatic_council, @joyval
Proposal 910 - Bounty 18. Payments. 16-th week.
- Proposal Link: https://testnet.joystream.org/#/proposals/910
- Proposal Type: Spending
- Status: Approved & Executed
- Time to finalize: 9040 blocks (15.31h)
- Created by: @joydiesel
- Participants: @marinag_mary, @kadyrovs, @nkhlghbl, @marat_mu, @ururu, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @laura, @art_khabibullin
Proposal 911 - Weekly Curator Working Group Report 34
- Proposal Link: https://testnet.joystream.org/#/proposals/911
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9568 blocks (16.21h)
- Created by: @laura
- Participants: @marinag_mary, @kadyrovs, @nkhlghbl, @ururu, @blackmass, @nanapa6otaet, @zazik, @xfactorus, @ilich, @laura, @art_khabibullin, @tomato
Proposal 912 - Mint Content Working Group
- Proposal Link: https://testnet.joystream.org/#/proposals/912
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 6372 blocks (10.79h)
- Created by: @laura
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @ururu, @zazik, @xfactorus, @ilich, @laura, @art_khabibullin, @tomato
Proposal 913 - Joystream Node Issues report
- Proposal Link: https://testnet.joystream.org/#/proposals/913
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9916 blocks (16.80h)
- Created by: @svasilenko
- Participants: @marinag_mary, @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @ururu, @blackmass, @xfactorus, @ilich, @laura, @freakstatic_council, @art_khabibullin
Proposal 914 - Weekly Storage WG Report 27
- Proposal Link: https://testnet.joystream.org/#/proposals/914
- Proposal Type: Text
- Status: Approved & Executed
- Time to finalize: 9892 blocks (16.76h)
- Created by: @0x2bc
- Participants: @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @ururu, @blackmass, @zazik, @xfactorus, @ilich, @laura, @freakstatic_council, @art_khabibullin
Proposal 915 - Refill Storage WG mint
- Proposal Link: https://testnet.joystream.org/#/proposals/915
- Proposal Type: SetWorkingGroupMintCapacity
- Status: Approved & Executed
- Time to finalize: 11995 blocks (20.32h)
- Created by: @0x2bc
- Participants: @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @ururu, @blackmass, @zazik, @xfactorus, @ilich, @controlla, @laura, @freakstatic_council
Proposal 916 - Bounty 24. Payments. 11-th week.
- Proposal Link: https://testnet.joystream.org/#/proposals/916
- Proposal Type: Spending
- Status: Approved & Executed
- Time to finalize: 11025 blocks (18.68h)
- Created by: @arseniy2706
- Participants: @kadyrovs, @svasilenko, @marat_mu, @lkskrn, @ururu, @blackmass, @zazik, @xfactorus, @ilich, @controlla, @laura, @tomato
Proposal 917 - Move governance files into council
Proposal 918 - Curator Lead OKR rewards
Proposal 919 - 34.CC-1 featured categories script
Proposal 920 - Refill OWG mint
Proposal 921 - 35.I-3 - Deputy Council Secretary
2.4 - Select threads & events
Joystream Community Call #4
2.5 - Working Group Spotchecks
3 - Review
3.1 - Workflow, Performance, Challenged & Thinking
https://pioneer.joystreamstats.live/#/forum/threads/816
4 - Obligations
Council obligations are payments or items that carry through council sessions. These are noted so that future councils can easily see what items they should be aware of. Items can be removed from here once they have been resolved or become outdated.
4.1 Current Documents / Processes
- Council Report
- Each council should produce a report which highlights important events, council participation, mint spending and other important facts surrounding the council term
- Council Budget
- This is a proposal which tries to guide how many tokens the current council may have available to it during a term. This is a non binding proposal, so is mainly used as a guide for now.
4.2 Regular Payments / Proposals
- Council Mint
- The council mint needs to be checked on a regular basis and in the event it is near depletion, a council member should notify a member of Jsgenesis in order for it to be refilled.
- The council mint is set at a value decided by Jsgenesis.
- Council Roles
- Council Secretary
- This role was introduced in Council Round #18 and the payments are now managed by KPI rewards.
- Content Curator Mint
- The Content Curator Mint currently has a maximum value of 5 million tokens.
- The Content Curator Mint has to be filled periodically and the agreed amount was discussed earlier. The amount may change in the future, but the rewards for this role are dependent on the council passing these proposals in a timely fashion.
- The Content Curator Lead role is expected to keep track of their mint level and any member of the Joystream platform can create a proposal to refill this mint.
- Storage Mint
- The Storage Mint currently has a maximum value of 5 million tokens.
- This mint has be refilled periodically
- The Storage Lead role is expected to keep track of their mint level and any member of the Joystream platform can create a proposal to refill this mint.
4.2 Bounties
5 - Report changelog
October, November 2021
- proposals refactor, show amount for spending proposals
- merge council report script into tokenomics generator (PR #485)
04.11.2020
- added working group review section
22.10.2020
- updated budget section to reflect nature of new budget system
- updated events to be threads & events
14.09.2020
- removed member addresses and replaced with member IDs since they take less space
- added realized and unrealized spending